Thursday 10 November 2011

Group Work Update



















Continung from the initial model created by 0920876 I have simplified some of the walls and added in extras that were accidently missed out. The ground floor walls are pretty much accurate to the blueprints.
















Second floor walls overhang the first floor slightly and match up with the seperate part of the building on the right hand side. The foundation is also in place.

0918959 has agreed to model the roof while the rest of the group begin focusing on detailing the current walls by adding windows/doors.

No comments:

Post a Comment